Industry:

Greenville Water Treatment Plant

  • Location: Greenville, IL
  • Size: 26,496 sq. ft
  • Design Team: Milano & Grunloh Engineers
  • Service Provided: General Contracting
Greenville Water Treatment Plant

Project Overview

This project involved constructing a new 4.32 MGD water treatment plant with a 26,496 SF pre-engineered metal building. The facility includes clarifiers, filters, recarbs, a lime silo, head tank, chemical feed equipment, SCADA controls, and administrative office space. Site work included utilities, a 500,000-gallon ground storage tank, intake pump replacement with structural modifications, and critical system integrations.