Sullivan Water Treatment Plant

  • Location: Sullivan, IL
  • Size: 12,823 sq. ft
  • Design Team: Milano & Grunloh Engineers
  • Service Provided: General Contracting
Sullivan Water Treatment Plant

Project Overview

This project involved building a new 2.16 MGD water treatment plant featuring a 12,823 SF pre-engineered metal building. The facility includes clarifiers, filters, recarbs, a lime silo, head tank, chemical feed systems, SCADA controls, staff offices, and extensive site work such as utilities, concrete drying beds, and system tie-ins to the existing infrastructure.